Track and facility information
Building | Track number | Total track length (m) | Catenary | Pit length (m) | Train lift | Roof access | Bridge crane | Thawing/drying | Toilet disposal system | Water filling | Train heating | Train wash | Cadaver sanitation | Train weight | Media system | Wheel turning | Paint shop | Compressed air | Comments |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Workshop | 0 Syd | 41 | X | 39 | – | X | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 1 Syd | 119 | X |
40 m |
– | – | X | – | – | – | 1000V | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 4 Syd | 107 | – | 19 | – | – | X | – | – | – | 1000V | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 13 Syd | 110 | – | 110 | 20 x 22 t | – | X | – | – | – | 1000V | X | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 14 Syd | 110 | – | 110 | Storage | – | X | – | – | – | – | X | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 15 Syd | 110 | – | 110 | Storage | – | X | – | – | – | – | X | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 2 Nord | 62 | – | 52 | 4 x 55 t 4 x 25 t |
– | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | The following disconnect switches have been removed from track 2 Nord: Z-133, ZH-109, ZH-110. |
Workshop | 3 Nord | 52 | – | 52 | 8 x 25 t | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 3A Nord | 50 | – | 30 | 8 x 22 t | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 5 Nord | 10 | – | – | – | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 6 Nord | 9 | – | – | – | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 7 Nord | 14 | – | – | – | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 10 Nord | 33 | – | 22 | - | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 11 Nord | 188 | – | – | – | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 12 Nord | 110 | – | 21 + 19 | – | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 13 Nord | 110 | – | 22 + 19 | X | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 14 Nord | 110 | – | 51 + 26 | 16 x 15 t | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 15 Nord | 110 | – | 51 + 23 | 16 x 15 t | – | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 16 Nord | 110 | – | – | – | X | X | – | – | – | – | – | – | – | – | – | – | ISO8573-1 class 1-2-1 | |
Workshop | 17 Nord | 110 | – | – | 16 x 25 t | – | X | – | – | – | 400V | – | – | X | – | – | – | – | |
Workshop | 19 Nord | 110 | – | – | – | – | X | – | – | – | – | – | – | – | – | – | X | ISO8573-1 class 1-4-1 |
The machines and equipment listed in the table have technical and performance limitations. For further information or specific clarifications regarding rolling stock, please contact us.